Shows where real demand signals look stronger or weaker than market expectations. Context only; not a buy or sell signal.显示真实需求信号相对市场预期更强或更弱的位置。仅供参考,非买入或卖出信号。 · As of截至 2026-10-17
| Spender支出方 | Capex/OCF资本开支/OCF | Trend趋势 | Capex YoY资本开支同比 | FCF ($B)自由现金流(十亿) | FCF trend自由现金流趋势 | Net-debt Δ ($B)净债务变化(十亿) | FY财年 | Flag标记 |
|---|---|---|---|---|---|---|---|---|
| MSFT | 63% | rising上升 | +80% | +67.0 | deteriorating恶化 | +6.5 | FY2026 | |
| GOOGL | 56% | rising上升 | +74% | +73.3 | improving改善 | +29.4 | FY2025 | |
| AMZN | 94% | rising上升 | +59% | +7.7 | deteriorating恶化 | +2.7 | FY2025 | |
| META | 60% | rising上升 | +87% | +46.1 | deteriorating恶化 | +37.9 | FY2025 | |
| ORCL | 174% | rising上升 | +162% | -23.7 | deteriorating恶化 | -20.6 | FY2026 | FCF trapFCF陷阱 |
| Spender支出方 | Capex/OCF资本开支/OCF | Trend趋势 | Capex YoY资本开支同比 | FCF ($B)自由现金流(十亿) | FCF trend自由现金流趋势 | Net-debt Δ ($B)净债务变化(十亿) | FY财年 | Flag标记 |
|---|---|---|---|---|---|---|---|---|
| DHI | 4% | falling下降 | -17% | +3.3 | improving改善 | — | FY2025 | |
| LEN | 87% | rising上升 | +10% | +0.0 | deteriorating恶化 | — | FY2025 | |
| PHM | 7% | flat持平 | +4% | +1.8 | improving改善 | -0.3 | FY2025 | |
| NVR | 2% | flat持平 | -16% | +1.1 | deteriorating恶化 | — | FY2025 | |
| TOL | 8% | flat持平 | +17% | +1.0 | improving改善 | — | FY2025 | |
| KBH | 14% | rising上升 | +23% | +0.3 | deteriorating恶化 | — | FY2025 |
Annual XBRL (fingerprint-class); lag ~90 days from fiscal-year-end. Net-debt delta from balance-sheet YoY — may include acquisitions. Not a sell signal. Display-only.年度XBRL(指纹级);财年末后约90天滞后。净债务变化来自资产负债表同比——可能包含并购。非卖出信号。仅展示。
Independent demand running ahead of estimates — the variant list. Worth watching, not a buy signal.独立需求跑在预期之前——变体清单。值得关注,非买入信号。
| Name标的 | Chain链条 | Independent signal独立信号 | Consensus共识 |
|---|---|---|---|
| XYL
Contracted bookings (RPO) decelerating (+111% YoY to ~$2B, 0.2× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)增速放缓(同比+111%,约 $2B,覆盖营收 0.2 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +111% decelerating增速放缓 | flatflat |
| TMDX
Contracted bookings (RPO) accelerating (+75% YoY to ~$0B, 0.0× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+75%,约 $0B,覆盖营收 0.0 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +75% accelerating加速 | fallingfalling |
| CEG
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | flatflat |
| TLN
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | flatflat |
| SO
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | fallingfalling |
| BWXT
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | fallingfalling |
| NEE
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | fallingfalling |
| QCOM
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | fallingfalling |
| NXT
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for data-center power & cooling云厂商资本开支加速(同比+69%,约 $379B)——数据中心供电与散热的需求来源 |
ai_datacenter · power | +69% accelerating加速 | fallingfalling |
| D
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | flatflat |
| PCG
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | fallingfalling |
| DUK
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | flatflat |
| SRE
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | flatflat |
| VECO
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | fallingfalling |
| VST
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | fallingfalling |
| LEU
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | fallingfalling |
| NRG
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | fallingfalling |
| AVGO
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | fallingfalling |
| AVAV
Contracted bookings (RPO) decelerating (+62% YoY to ~$1B, 0.6× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)增速放缓(同比+62%,约 $1B,覆盖营收 0.6 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +62% decelerating增速放缓 | fallingfalling |
| ORA
Contracted bookings (RPO) decelerating (+59% YoY to ~$0B, 0.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)增速放缓(同比+59%,约 $0B,覆盖营收 0.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +59% decelerating增速放缓 | flatflat |
| CRWD
Contracted bookings (RPO) still expanding (+38% YoY to ~$9B, 1.9× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)持续扩张(同比+38%,约 $9B,覆盖营收 1.9 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +38% expanding扩张 | flatflat |
| BA
Contracted bookings (RPO) accelerating (+31% YoY to ~$682B, 7.6× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+31%,约 $682B,覆盖营收 7.6 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +31% accelerating加速 | fallingfalling |
| NOW
Contracted bookings (RPO) accelerating (+26% YoY to ~$28B, 2.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+26%,约 $28B,覆盖营收 2.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +26% accelerating加速 | flatflat |
| PTC
Contracted bookings (RPO) accelerating (+26% YoY to ~$3B, 1.0× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+26%,约 $3B,覆盖营收 1.0 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +26% accelerating加速 | flatflat |
| PANW
Contracted bookings (RPO) accelerating (+24% YoY to ~$16B, 1.7× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+24%,约 $16B,覆盖营收 1.7 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +24% accelerating加速 | fallingfalling |
| RTX
Contracted bookings (RPO) accelerating (+23% YoY to ~$268B, 3.0× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+23%,约 $268B,覆盖营收 3.0 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +23% accelerating加速 | flatflat |
| V
Contracted bookings (RPO) decelerating (+20% YoY to ~$5B, 0.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)增速放缓(同比+20%,约 $5B,覆盖营收 0.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +20% decelerating增速放缓 | fallingfalling |
| LDOS
Contracted bookings (RPO) accelerating (+14% YoY to ~$18B, 1.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+14%,约 $18B,覆盖营收 1.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +14% accelerating加速 | fallingfalling |
| A
Contracted bookings (RPO) decelerating (+7% YoY to ~$0B, 0.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)增速放缓(同比+7%,约 $0B,覆盖营收 0.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +7% decelerating增速放缓 | flatflat |
| Name标的 | Chain链条 | Independent signal独立信号 | Consensus共识 |
|---|---|---|---|
| ATI
Contracted bookings (RPO) contracting (-5% YoY to ~$4B, 0.8× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)收缩(同比-5%,约 $4B,覆盖营收 0.8 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | -5% contracting收缩 | risingrising |
| WDC
Contracted bookings (RPO) contracting (-37% YoY to ~$0B, 0.0× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)收缩(同比-37%,约 $0B,覆盖营收 0.0 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | -37% contracting收缩 | risingrising |
| MTRN
Contracted bookings (RPO) contracting (-44% YoY to ~$0B, 0.0× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)收缩(同比-44%,约 $0B,覆盖营收 0.0 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | -44% contracting收缩 | risingrising |
| PFE
Contracted bookings (RPO) contracting (-56% YoY to ~$15B, 0.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)收缩(同比-56%,约 $15B,覆盖营收 0.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | -56% contracting收缩 | risingrising |
| ROK
Contracted bookings (RPO) contracting (-100% YoY to ~$0B, 0.0× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)收缩(同比-100%,约 $0B,覆盖营收 0.0 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | -100% contracting收缩 | risingrising |
| Name标的 | Chain链条 | Independent signal独立信号 | Consensus共识 |
|---|---|---|---|
| PLTR
Contracted bookings (RPO) accelerating (+141% YoY to ~$4B, 0.9× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+141%,约 $4B,覆盖营收 0.9 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +141% accelerating加速 | risingrising |
| POWL
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for data-center power & cooling云厂商资本开支加速(同比+69%,约 $379B)——数据中心供电与散热的需求来源 |
ai_datacenter · power | +69% accelerating加速 | risingrising |
| VRT
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI infrastructure (compute, memory, networking)云厂商资本开支加速(同比+69%,约 $379B)——AI 基础设施(算力/内存/网络)的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| AMD
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| DELL
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI infrastructure (compute, memory, networking)云厂商资本开支加速(同比+69%,约 $379B)——AI 基础设施(算力/内存/网络)的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| AEIS
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| ETN
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for data-center power & cooling云厂商资本开支加速(同比+69%,约 $379B)——数据中心供电与散热的需求来源 |
ai_datacenter · power | +69% accelerating加速 | risingrising |
| GEV
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for data-center power & cooling云厂商资本开支加速(同比+69%,约 $379B)——数据中心供电与散热的需求来源 |
ai_datacenter · power | +69% accelerating加速 | risingrising |
| NVT
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for data-center power & cooling云厂商资本开支加速(同比+69%,约 $379B)——数据中心供电与散热的需求来源 |
ai_datacenter · power | +69% accelerating加速 | risingrising |
| HUBB
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for data-center power & cooling云厂商资本开支加速(同比+69%,约 $379B)——数据中心供电与散热的需求来源 |
ai_datacenter · power | +69% accelerating加速 | risingrising |
| FIX
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | risingrising |
| NVDA
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| ACLS
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| EME
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | risingrising |
| ONTO
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| PWR
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | risingrising |
| FORM
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| TER
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI infrastructure (compute, memory, networking)云厂商资本开支加速(同比+69%,约 $379B)——AI 基础设施(算力/内存/网络)的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| ANET
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| UCTT
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| AMAT
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| SMCI
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| LRCX
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| KLAC
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| ICHR
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| LITE
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI infrastructure (compute, memory, networking)云厂商资本开支加速(同比+69%,约 $379B)——AI 基础设施(算力/内存/网络)的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| MU
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI infrastructure (compute, memory, networking)云厂商资本开支加速(同比+69%,约 $379B)——AI 基础设施(算力/内存/网络)的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| GLW
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI infrastructure (compute, memory, networking)云厂商资本开支加速(同比+69%,约 $379B)——AI 基础设施(算力/内存/网络)的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| CIEN
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI infrastructure (compute, memory, networking)云厂商资本开支加速(同比+69%,约 $379B)——AI 基础设施(算力/内存/网络)的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| GNRC
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | risingrising |
| COHU
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| APH
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI infrastructure (compute, memory, networking)云厂商资本开支加速(同比+69%,约 $379B)——AI 基础设施(算力/内存/网络)的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| AEP
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | risingrising |
| ENTG
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| COHR
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI infrastructure (compute, memory, networking)云厂商资本开支加速(同比+69%,约 $379B)——AI 基础设施(算力/内存/网络)的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| KLIC
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| MPWR
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| MRVL
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | risingrising |
| MKSI
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | risingrising |
| DDOG
Contracted bookings (RPO) accelerating (+52% YoY to ~$4B, 1.0× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+52%,约 $4B,覆盖营收 1.0 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +52% accelerating加速 | risingrising |
| ZBRA
Contracted bookings (RPO) decelerating (+48% YoY to ~$1B, 0.2× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)增速放缓(同比+48%,约 $1B,覆盖营收 0.2 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +48% decelerating增速放缓 | risingrising |
| ORCL
Contracted bookings (RPO) decelerating (+41% YoY to ~$138B, 2.4× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)增速放缓(同比+41%,约 $138B,覆盖营收 2.4 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +41% decelerating增速放缓 | risingrising |
| MSFT
Contracted bookings (RPO) accelerating (+36% YoY to ~$375B, 1.3× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+36%,约 $375B,覆盖营收 1.3 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +36% accelerating加速 | risingrising |
| MDT
Contracted bookings (RPO) accelerating (+33% YoY to ~$0B, 0.0× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+33%,约 $0B,覆盖营收 0.0 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +33% accelerating加速 | risingrising |
| GD
Contracted bookings (RPO) accelerating (+30% YoY to ~$118B, 2.2× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+30%,约 $118B,覆盖营收 2.2 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +30% accelerating加速 | risingrising |
| CRM
Contracted bookings (RPO) accelerating (+27% YoY to ~$72B, 1.7× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+27%,约 $72B,覆盖营收 1.7 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +27% accelerating加速 | risingrising |
| ENS
Contracted bookings (RPO) accelerating (+22% YoY to ~$0B, 0.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+22%,约 $0B,覆盖营收 0.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +22% accelerating加速 | risingrising |
| DHR
Contracted bookings (RPO) accelerating (+21% YoY to ~$5B, 0.2× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+21%,约 $5B,覆盖营收 0.2 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +21% accelerating加速 | risingrising |
| CW
Contracted bookings (RPO) accelerating (+21% YoY to ~$4B, 1.2× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+21%,约 $4B,覆盖营收 1.2 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +21% accelerating加速 | risingrising |
| QLYS
Contracted bookings (RPO) accelerating (+19% YoY to ~$0B, 0.8× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+19%,约 $0B,覆盖营收 0.8 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +19% accelerating加速 | risingrising |
| PATH
Contracted bookings (RPO) accelerating (+19% YoY to ~$2B, 0.9× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+19%,约 $2B,覆盖营收 0.9 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +19% accelerating加速 | risingrising |
| TRMB
Contracted bookings (RPO) accelerating (+18% YoY to ~$2B, 0.6× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+18%,约 $2B,覆盖营收 0.6 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +18% accelerating加速 | risingrising |
| OKTA
Contracted bookings (RPO) decelerating (+14% YoY to ~$5B, 1.7× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)增速放缓(同比+14%,约 $5B,覆盖营收 1.7 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +14% decelerating增速放缓 | risingrising |
| TMO
Contracted bookings (RPO) accelerating (+13% YoY to ~$28B, 0.6× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+13%,约 $28B,覆盖营收 0.6 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +13% accelerating加速 | risingrising |
| ADBE
Contracted bookings (RPO) decelerating (+13% YoY to ~$22B, 0.9× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)增速放缓(同比+13%,约 $22B,覆盖营收 0.9 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +13% decelerating增速放缓 | risingrising |
| ILMN
Contracted bookings (RPO) accelerating (+12% YoY to ~$1B, 0.2× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+12%,约 $1B,覆盖营收 0.2 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +12% accelerating加速 | risingrising |
| FTNT
Contracted bookings (RPO) accelerating (+12% YoY to ~$7B, 1.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+12%,约 $7B,覆盖营收 1.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +12% accelerating加速 | risingrising |
| LMT
Contracted bookings (RPO) accelerating (+10% YoY to ~$194B, 2.6× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+10%,约 $194B,覆盖营收 2.6 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +10% accelerating加速 | risingrising |
| HII
Contracted bookings (RPO) accelerating (+9% YoY to ~$53B, 4.3× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+9%,约 $53B,覆盖营收 4.3 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +9% accelerating加速 | risingrising |
| KTOS
Contracted bookings (RPO) decelerating (+9% YoY to ~$2B, 1.2× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)增速放缓(同比+9%,约 $2B,覆盖营收 1.2 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +9% decelerating增速放缓 | risingrising |
| NTAP
Contracted bookings (RPO) accelerating (+8% YoY to ~$4B, 0.7× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+8%,约 $4B,覆盖营收 0.7 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +8% accelerating加速 | risingrising |
| HUBS
Headcount accelerating (+8% YoY to ~8.9k) — the company's revealed hiring bet员工人数加速(同比+8%,约 8.9k)——公司用招聘表达的需求押注 |
hiring · headcount | +8% accelerating加速 | risingrising |
| ITRI
Contracted bookings (RPO) accelerating (+7% YoY to ~$2B, 0.9× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+7%,约 $2B,覆盖营收 0.9 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +7% accelerating加速 | risingrising |
| CF
Contracted bookings (RPO) flat (+4% YoY to ~$2B, 0.3× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)持平(同比+4%,约 $2B,覆盖营收 0.3 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +4% flat持平 | risingrising |
| GOOGL
Headcount flat (+4% YoY to ~190.8k) — the company's revealed hiring bet员工人数持平(同比+4%,约 190.8k)——公司用招聘表达的需求押注 |
hiring · headcount | +4% flat持平 | risingrising |
| DE
Contracted bookings (RPO) flat (+4% YoY to ~$2B, 0.0× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)持平(同比+4%,约 $2B,覆盖营收 0.0 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +4% flat持平 | risingrising |
| INTU
Headcount flat (+2% YoY to ~18.6k) — the company's revealed hiring bet员工人数持平(同比+2%,约 18.6k)——公司用招聘表达的需求押注 |
hiring · headcount | +2% flat持平 | fallingfalling |
| IQV
Contracted bookings (RPO) flat (+2% YoY to ~$34B, 2.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)持平(同比+2%,约 $34B,覆盖营收 2.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +2% flat持平 | flatflat |
| LH
Contracted bookings (RPO) flat (-0% YoY to ~$5B, 0.3× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)持平(同比-0%,约 $5B,覆盖营收 0.3 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | -0% flat持平 | risingrising |
| OC
Homebuilder volume (revenue) contracting (-4% YoY to ~$113B) — the demand pool for building-products suppliers建筑商销量(营收)收缩(同比-4%,约 $113B)——建材供应商的需求来源 |
housing · products | -4% contracting收缩 | fallingfalling |
| SHW
Homebuilder volume (revenue) contracting (-4% YoY to ~$113B) — the demand pool for building-products suppliers建筑商销量(营收)收缩(同比-4%,约 $113B)——建材供应商的需求来源 |
housing · products | -4% contracting收缩 | flatflat |
| BLDR
Homebuilder volume (revenue) contracting (-4% YoY to ~$113B) — the demand pool for building-products suppliers建筑商销量(营收)收缩(同比-4%,约 $113B)——建材供应商的需求来源 |
housing · products | -4% contracting收缩 | fallingfalling |
| FBIN
Homebuilder volume (revenue) contracting (-4% YoY to ~$113B) — the demand pool for building-products suppliers建筑商销量(营收)收缩(同比-4%,约 $113B)——建材供应商的需求来源 |
housing · products | -4% contracting收缩 | fallingfalling |
| MAS
Homebuilder volume (revenue) contracting (-4% YoY to ~$113B) — the demand pool for building-products suppliers建筑商销量(营收)收缩(同比-4%,约 $113B)——建材供应商的需求来源 |
housing · products | -4% contracting收缩 | fallingfalling |
| CARR
Homebuilder volume (revenue) contracting (-4% YoY to ~$113B) — the demand pool for building-products suppliers建筑商销量(营收)收缩(同比-4%,约 $113B)——建材供应商的需求来源 |
housing · products | -4% contracting收缩 | flatflat |
| MHK
Homebuilder volume (revenue) contracting (-4% YoY to ~$113B) — the demand pool for building-products suppliers建筑商销量(营收)收缩(同比-4%,约 $113B)——建材供应商的需求来源 |
housing · products | -4% contracting收缩 | flatflat |
| LII
Homebuilder volume (revenue) contracting (-4% YoY to ~$113B) — the demand pool for building-products suppliers建筑商销量(营收)收缩(同比-4%,约 $113B)——建材供应商的需求来源 |
housing · products | -4% contracting收缩 | fallingfalling |
| ENPH
Contracted bookings (RPO) contracting (-10% YoY to ~$0B, 0.4× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)收缩(同比-10%,约 $0B,覆盖营收 0.4 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | -10% contracting收缩 | fallingfalling |
| CMC
Contracted bookings (RPO) contracting (-12% YoY to ~$1B, 0.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)收缩(同比-12%,约 $1B,覆盖营收 0.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | -12% contracting收缩 | flatflat |
| APP
Headcount contracting (-52% YoY to ~0.4k) — the company's revealed hiring bet员工人数收缩(同比-52%,约 0.4k)——公司用招聘表达的需求押注 |
hiring · headcount | -52% contracting收缩 | fallingfalling |
| GPN
Contracted bookings (RPO) contracting (-76% YoY to ~$1B, 0.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)收缩(同比-76%,约 $1B,覆盖营收 0.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | -76% contracting收缩 | flatflat |
| DUOL
Headcount contracting (-81% YoY to ~0.1k) — the company's revealed hiring bet员工人数收缩(同比-81%,约 0.1k)——公司用招聘表达的需求押注 |
hiring · headcount | -81% contracting收缩 | fallingfalling |
| DOCU
Contracted bookings (RPO) flat (+0% YoY to ~$2B, 0.7× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)持平(同比+0%,约 $2B,覆盖营收 0.7 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +0% flat持平 | risingrising |
| MA
Contracted bookings (RPO) flat (+0% YoY to ~$1B, 0.1× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)持平(同比+0%,约 $1B,覆盖营收 0.1 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +0% flat持平 | risingrising |
| ZBH
Contracted bookings (RPO) unclear (n/a YoY to ~$0B) — signed demand locked in ahead of recognition已签约订单(RPO)不明(同比n/a,约 $0B)——已锁定、尚未确认的需求 |
own_rpo · bookings | n/a不明 | fallingfalling |
| Name标的 | Chain链条 | Independent signal独立信号 | Consensus共识 |
|---|---|---|---|
| CBRS
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | nonenone |
| NBIS
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for GPU neocloud capacity云厂商资本开支加速(同比+69%,约 $379B)——GPU 新云算力的需求来源 |
ai_datacenter · neocloud | +69% accelerating加速 | nonenone |
| SMR
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | nonenone |
| WULF
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for GPU neocloud capacity云厂商资本开支加速(同比+69%,约 $379B)——GPU 新云算力的需求来源 |
ai_datacenter · neocloud | +69% accelerating加速 | nonenone |
| NVMI
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | nonenone |
| ALAB
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | nonenone |
| NNE
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for nuclear / SMR power for data centers云厂商资本开支加速(同比+69%,约 $379B)——数据中心核电/小型堆的需求来源 |
ai_datacenter · power | +69% accelerating加速 | nonenone |
| CIFR
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for GPU neocloud capacity云厂商资本开支加速(同比+69%,约 $379B)——GPU 新云算力的需求来源 |
ai_datacenter · neocloud | +69% accelerating加速 | nonenone |
| CORZ
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for GPU neocloud capacity云厂商资本开支加速(同比+69%,约 $379B)——GPU 新云算力的需求来源 |
ai_datacenter · neocloud | +69% accelerating加速 | nonenone |
| APLD
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for GPU neocloud capacity云厂商资本开支加速(同比+69%,约 $379B)——GPU 新云算力的需求来源 |
ai_datacenter · neocloud | +69% accelerating加速 | nonenone |
| OKLO
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for power & grid buildout云厂商资本开支加速(同比+69%,约 $379B)——电力与电网建设的需求来源 |
ai_datacenter · power | +69% accelerating加速 | nonenone |
| CRDO
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | nonenone |
| BTDR
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for GPU neocloud capacity云厂商资本开支加速(同比+69%,约 $379B)——GPU 新云算力的需求来源 |
ai_datacenter · neocloud | +69% accelerating加速 | nonenone |
| CAMT
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for wafer-fab equipment (one step back, longer lead)云厂商资本开支加速(同比+69%,约 $379B)——晶圆制造设备(上游一环,前置更长)的需求来源 |
ai_datacenter · wfe | +69% accelerating加速 | nonenone |
| CRWV
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for GPU neocloud capacity云厂商资本开支加速(同比+69%,约 $379B)——GPU 新云算力的需求来源 |
ai_datacenter · neocloud | +69% accelerating加速 | nonenone |
| IREN
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for GPU neocloud capacity云厂商资本开支加速(同比+69%,约 $379B)——GPU 新云算力的需求来源 |
ai_datacenter · neocloud | +69% accelerating加速 | nonenone |
| HUT
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for GPU neocloud capacity云厂商资本开支加速(同比+69%,约 $379B)——GPU 新云算力的需求来源 |
ai_datacenter · neocloud | +69% accelerating加速 | nonenone |
| RIOT
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for GPU neocloud capacity云厂商资本开支加速(同比+69%,约 $379B)——GPU 新云算力的需求来源 |
ai_datacenter · neocloud | +69% accelerating加速 | nonenone |
| ARM
Hyperscaler capex accelerating (+69% YoY to ~$379B) — the demand pool for AI accelerator / compute silicon云厂商资本开支加速(同比+69%,约 $379B)——AI 加速器/算力芯片的需求来源 |
ai_datacenter · compute | +69% accelerating加速 | nonenone |
| CTVA
Contracted bookings (RPO) accelerating (+8% YoY to ~$0B, 0.0× revenue) — signed demand locked in ahead of recognition已签约订单(RPO)加速(同比+8%,约 $0B,覆盖营收 0.0 倍)——已锁定、尚未确认的需求 |
own_rpo · bookings | +8% accelerating加速 | nonenone |
| Name标的 | Chain链条 | Lean倾向 | Check by检验日 |
|---|---|---|---|
| ADBE | own_rpo | outperform跑赢 | 2026-12-14 |
| CLSK | ai_datacenter | outperform跑赢 | 2026-12-14 |
| PANW | own_rpo | outperform跑赢 | 2026-12-14 |
| PCG | ai_datacenter | outperform跑赢 | 2026-12-14 |
| QCOM | ai_datacenter | outperform跑赢 | 2026-12-14 |
| SO | ai_datacenter | outperform跑赢 | 2026-12-14 |
| VST | ai_datacenter | outperform跑赢 | 2026-12-14 |
| CEG | ai_datacenter | outperform跑赢 | 2026-12-21 |
| ACLS | ai_datacenter | outperform跑赢 | 2026-12-28 |
| AEP | own_rpo | underperform跑输 | 2026-12-28 |
| ATI | own_rpo | underperform跑输 | 2026-12-28 |
| AVAV | own_rpo | outperform跑赢 | 2026-12-28 |
| BA | own_rpo | outperform跑赢 | 2026-12-28 |
| CEG | own_rpo | outperform跑赢 | 2026-12-28 |
| COHU | own_rpo | underperform跑输 | 2026-12-28 |
| CTVA | own_rpo | outperform跑赢 | 2026-12-28 |
| D | own_rpo | underperform跑输 | 2026-12-28 |
| HII | own_rpo | outperform跑赢 | 2026-12-28 |
| ITRI | own_rpo | outperform跑赢 | 2026-12-28 |
| KLAC | own_rpo | underperform跑输 | 2026-12-28 |
| LMT | own_rpo | outperform跑赢 | 2026-12-28 |
| MDT | own_rpo | outperform跑赢 | 2026-12-28 |
| MTRN | own_rpo | underperform跑输 | 2026-12-28 |
| ORA | own_rpo | outperform跑赢 | 2026-12-28 |
| PFE | own_rpo | underperform跑输 | 2026-12-28 |
| ROK | own_rpo | underperform跑输 | 2026-12-28 |
| TER | own_rpo | underperform跑输 | 2026-12-28 |
| TLN | ai_datacenter | outperform跑赢 | 2026-12-28 |
| TMDX | own_rpo | outperform跑赢 | 2026-12-28 |
| TMO | own_rpo | outperform跑赢 | 2026-12-28 |
| VST | own_rpo | outperform跑赢 | 2026-12-28 |
| WDC | own_rpo | underperform跑输 | 2026-12-28 |
| XYL | own_rpo | outperform跑赢 | 2026-12-28 |
| DUK | ai_datacenter | outperform跑赢 | 2026-12-29 |
| GEV | ai_datacenter | outperform跑赢 | 2026-12-29 |
| GEV | own_rpo | outperform跑赢 | 2026-12-29 |
| GLW | ai_datacenter | outperform跑赢 | 2026-12-29 |
| KTOS | own_rpo | outperform跑赢 | 2026-12-30 |
| LDOS | own_rpo | outperform跑赢 | 2026-12-30 |
| NRG | ai_datacenter | outperform跑赢 | 2026-12-30 |
| CMC | own_rpo | underperform跑输 | 2027-01-04 |
| PTC | own_rpo | outperform跑赢 | 2027-01-11 |
| RTX | own_rpo | outperform跑赢 | 2027-01-11 |
| ENS | own_rpo | outperform跑赢 | 2027-01-18 |
| LEU | ai_datacenter | outperform跑赢 | 2027-01-18 |
| NXT | ai_datacenter | outperform跑赢 | 2027-01-26 |
| V | own_rpo | outperform跑赢 | 2027-01-28 |
| BWXT | ai_datacenter | outperform跑赢 | 2027-01-29 |
| BWXT | own_rpo | outperform跑赢 | 2027-01-29 |
| CRM | own_rpo | outperform跑赢 | 2027-01-29 |
| A | own_rpo | outperform跑赢 | 2027-02-01 |
| AEP | ai_datacenter | outperform跑赢 | 2027-02-01 |
| DHR | own_rpo | outperform跑赢 | 2027-02-01 |
| ICHR | ai_datacenter | outperform跑赢 | 2027-02-01 |
| NOW | own_rpo | outperform跑赢 | 2027-02-01 |
| D | ai_datacenter | outperform跑赢 | 2027-02-11 |
| NTAP | own_rpo | outperform跑赢 | 2027-02-12 |
| PATH | own_rpo | outperform跑赢 | 2027-02-12 |
| SRE | ai_datacenter | outperform跑赢 | 2027-02-15 |
| NEE | ai_datacenter | outperform跑赢 | 2027-03-01 |
| CRWD | own_rpo | outperform跑赢 | 2027-03-04 |
| AVGO | ai_datacenter | outperform跑赢 | 2027-03-15 |
| AVGO | own_rpo | outperform跑赢 | 2027-03-15 |
| HUBB | ai_datacenter | outperform跑赢 | 2027-03-15 |
| VECO | ai_datacenter | outperform跑赢 | 2027-03-22 |
0 decided / 65 open. Need ≥20 decided before a verdict means anything; the forward record is still accruing (theses grade as their ~6-month horizons elapse). The signal is NOT back-testable historically (annual cadence, no point-in-time consensus history), so this forward ledger is the only honest path.已判定 0 个/未结 65 个。需至少 20 个已判定才有意义;前向记录仍在累积(随约6个月持有期到期逐步判定)。该信号无法用历史数据回测(年度频率、无时点共识历史),故此前向记录是唯一诚实的验证路径。
Method: each chain aggregates a spender cohort's capex/revenue (or a name's own RPO) from SEC filings as the forward-demand pool, then compares its trend to the name's analyst-revision direction. Cross-company / annual / coarse — a divergence flag, not a forecast. The signal is NOT historically back-testable (annual cadence, no point-in-time consensus history), so the forward-scored ledger above is the only honest validation path.方法:每条链条以卖方/客户群体的资本开支或营收(或个股自身RPO)作为前瞻需求来源(来自SEC财报),再将其趋势与该股分析师评级调整方向对比。跨公司/年度/粗粒度——是背离标记而非预测。该信号无法用历史数据回测(年度频率、无时点共识历史),故上方前向评分记录是唯一诚实的验证路径。