50score评分
Nuclear & SMR Power
Early早期
early text纯文本Read from company filing language only — awaiting a hard, numeric supply confirmation.仅来自公司备案文本——待硬性数值供给确认。
AI-capex beneficiaryAI 资本开支受益 · indirect
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Supply is tight before estimates have moved — the biggest head start. The buy still waits for a dip.供给已紧、预期未动——先机最大。买点仍等待回调。
language signal TIGHT while revisions not yet firing — text-only; awaiting numeric physical confirmation · customer capex accelerating (+69% YoY) confirms demand · policy pipeline: comment close in 3d (2026-10-29); rule effective in 9d; 6 proposed rule(s) last 60d; 3 final rule(s) last 60d
⏳ text-only thesis — awaiting numeric physical confirmation; no entry until FRED bottleneck leg fires
⚖ Watch
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 2
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 7
members reporting家成员披露 · fiscal year财年
FY2025
member backlog成员订单积压 — 5
members reporting家成员披露 · fiscal year财年
FY2025
⚑ score held back评分受限: text-only (no physical bottleneck) -> capped at 50
before the cap上限前 67.4 · 6
of 7 axes reading/ 7 项有读数
50score评分
Grid & Electrification
Confirming确认中
early text纯文本Read from company filing language only — awaiting a hard, numeric supply confirmation.仅来自公司备案文本——待硬性数值供给确认。
AI-capex beneficiaryAI 资本开支受益 · indirect
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Estimates are starting to catch up — runway confirmed. Don’t chase the spikes.预期开始跟上——跑道确认。勿追高。
language signal TIGHT and revisions rising — text-only; awaiting numeric physical confirmation · customer capex accelerating (+69% YoY) confirms demand · policy pipeline: comment close in 0d (2026-10-26); 1 proposed rule(s) last 60d; 2 final rule(s) last 60d
⏳ text-only thesis — awaiting numeric physical confirmation; no entry until FRED bottleneck leg fires
⚖ Watch
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 2
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 6
members reporting家成员披露 · fiscal year财年
FY2025
member backlog成员订单积压 — 5
members reporting家成员披露 · fiscal year财年
FY2025
⚑ score held back评分受限: text-only (no physical bottleneck) -> capped at 50
before the cap上限前 68.7 · 6
of 7 axes reading/ 7 项有读数
50score评分
Space & Satellites
Confirming确认中
early text纯文本Read from company filing language only — awaiting a hard, numeric supply confirmation.仅来自公司备案文本——待硬性数值供给确认。
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Estimates are starting to catch up — runway confirmed. Don’t chase the spikes.预期开始跟上——跑道确认。勿追高。
language signal TIGHT and revisions rising — text-only; awaiting numeric physical confirmation · policy pipeline: comment close in 0d (2026-10-26); 9 proposed rule(s) last 60d; 5 final rule(s) last 60d
⏳ text-only thesis — awaiting numeric physical confirmation; no entry until FRED bottleneck leg fires
⚖ Watch
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 2
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 7
members reporting家成员披露 · fiscal year财年
FY2025
member backlog成员订单积压 — 3
members reporting家成员披露 · fiscal year财年
FY2025
⚑ score held back评分受限: text-only (no physical bottleneck) -> capped at 50
before the cap上限前 53.4 · 4
of 7 axes reading/ 7 项有读数
46score评分
Medical Devices
Early早期
from filings来自年报Inferred from annual XBRL filing fingerprints — provisional until a live numeric series confirms.由年度 XBRL 备案指纹推断——在实时数值序列确认前为暂定。
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Supply is tight before estimates have moved — the biggest head start. The buy still waits for a dip.供给已紧、预期未动——先机最大。买点仍等待回调。
fingerprint-only (annual member filings) TIGHT, revisions undetermined — awaiting real-time physical confirmation · policy pipeline: comment close in 0d (2026-10-26); rule effective in 42d; 1 proposed rule(s) last 60d; 19 final rule(s) last 60d
⏳ fingerprint-only thesis — awaiting real-time physical confirmation; no entry until FRED bottleneck leg fires
⚖ Watch
🛰 1 activist 13d
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 1
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 10
members reporting家成员披露 · fiscal year财年
FY2026
member backlog成员订单积压 — 2
members reporting家成员披露 · fiscal year财年
FY2026 ·
value withheld — too few members成员过少——数值不予给出
5
of 7 axes reading/ 7 项有读数
45score评分
Data Center Power & Cooling
Watching观察中
AI-capex beneficiaryAI 资本开支受益 · indirect
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: comment close in 2d (2026-10-28); 3 proposed rule(s) last 60d; 2 final rule(s) last 60d
⏳ not a thesis stage — no entry
⚖ Watch
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 1
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 7
members reporting家成员披露 · fiscal year财年
FY2026
member backlog成员订单积压 — 2
members reporting家成员披露 · fiscal year财年
FY2025 ·
value withheld — too few members成员过少——数值不予给出
⚑ score held back评分受限: WATCH (late) -> capped at 45
before the cap上限前 64.1 · 7
of 7 axes reading/ 7 项有读数
45score评分
Memory, HBM & Storage
Watching观察中
AI-capex beneficiaryAI 资本开支受益 · direct
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: comment close in 10d (2026-11-05); 2 final rule(s) last 60d
⏳ not a thesis stage — no entry
⚖ Watch
🛰 1 patent cluster
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 1
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 5
members reporting家成员披露 · fiscal year财年
FY2027
member backlog成员订单积压 — 2
members reporting家成员披露 · fiscal year财年
FY2022 ·
value withheld — too few members成员过少——数值不予给出
⚑ score held back评分受限: WATCH (late) -> capped at 45
before the cap上限前 50.9 · 7
of 7 axes reading/ 7 项有读数
45score评分
Semiconductor Equipment (WFE)
Watching观察中
AI-capex beneficiaryAI 资本开支受益 · lagged
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: comment close in 4d (2026-10-30)
⏳ not a thesis stage — no entry
⚖ Watch
🛰 1 patent cluster
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 2
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 9
members reporting家成员披露 · fiscal year财年
FY2026
member backlog成员订单积压 — 4
members reporting家成员披露 · fiscal year财年
FY2025
⚑ score held back评分受限: WATCH (late) -> capped at 45
before the cap上限前 60.7 · 7
of 7 axes reading/ 7 项有读数
45score评分
AI Semiconductors
Watching观察中
AI-capex beneficiaryAI 资本开支受益 · direct
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: comment close in 21d (2026-11-16)
⏳ not a thesis stage — no entry
⚖ Watch
🛰 2 patent cluster
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 2
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 7
members reporting家成员披露 · fiscal year财年
FY2026
member backlog成员订单积压 — 4
members reporting家成员披露 · fiscal year财年
FY2026
⚑ score held back评分受限: WATCH (late) -> capped at 45
before the cap上限前 53.9 · 7
of 7 axes reading/ 7 项有读数
45score评分
Copper, Steel & Electrification
Watching观察中
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: comment close in 17d (2026-11-12); 1 proposed rule(s) last 60d; 1 final rule(s) last 60d
⏳ not a thesis stage — no entry
⚖ Watch
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 1
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 5
members reporting家成员披露 · fiscal year财年
FY2026
member backlog成员订单积压 — 2
members reporting家成员披露 · fiscal year财年
FY2026 ·
value withheld — too few members成员过少——数值不予给出
⚑ score held back评分受限: WATCH (late) -> capped at 45
before the cap上限前 57.9 · 5
of 7 axes reading/ 7 项有读数
45score评分
Rare Earth & Critical Minerals
Watching观察中
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: comment close in 0d (2026-10-26); 1 proposed rule(s) last 60d; 5 final rule(s) last 60d
⏳ not a thesis stage — no entry
⚖ Watch
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 1
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 7
members reporting家成员披露 · fiscal year财年
FY2026
member backlog成员订单积压 — 2
members reporting家成员披露 · fiscal year财年
FY2025 ·
value withheld — too few members成员过少——数值不予给出
⚑ score held back评分受限: WATCH (late) -> capped at 45
before the cap上限前 80.3 · 5
of 7 axes reading/ 7 项有读数
45score评分
Defense & Aerospace
Watching观察中
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: comment close in 4d (2026-10-30); 5 proposed rule(s) last 60d; 5 final rule(s) last 60d
⏳ not a thesis stage — no entry
⚖ Watch
🛰 1 patent cluster
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 2
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 11
members reporting家成员披露 · fiscal year财年
FY2026
member backlog成员订单积压 — 9
members reporting家成员披露 · fiscal year财年
FY2026
⚑ score held back评分受限: WATCH (late) -> capped at 45
before the cap上限前 58.2 · 5
of 7 axes reading/ 7 项有读数
45score评分
Cybersecurity
Watching观察中
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: comment close in 11d (2026-11-06); rule effective in 761d; 5 proposed rule(s) last 60d; 5 final rule(s) last 60d
⏳ not a thesis stage — no entry
⚖ Watch
🛰 1 13f add · 1 activist 13d
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 2
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 3
members reporting家成员披露 · fiscal year财年
FY2026
member backlog成员订单积压 — 4
members reporting家成员披露 · fiscal year财年
FY2026
⚑ score held back评分受限: WATCH (late) -> capped at 45
before the cap上限前 47.1 · 5
of 7 axes reading/ 7 项有读数
45score评分
Fintech & Payments
Watching观察中
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: comment close in 9d (2026-11-04); 5 proposed rule(s) last 60d; 10 final rule(s) last 60d
⏳ not a thesis stage — no entry
⚖ Watch
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 1
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 2
members reporting家成员披露 · fiscal year财年
FY2025 ·
value withheld — too few members成员过少——数值不予给出
member backlog成员订单积压 — 3
members reporting家成员披露 · fiscal year财年
FY2025
⚑ score held back评分受限: WATCH (late) -> capped at 45
before the cap上限前 48.1 · 5
of 7 axes reading/ 7 项有读数
42score评分
Diagnostics & Life-Science Tools
Watching观察中
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: comment close in 14d (2026-11-09); rule effective in 42d; 2 proposed rule(s) last 60d; 6 final rule(s) last 60d
⏳ not a thesis stage — no entry
⚖ Watch
🛰 2 gov-award accel
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 2
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 9
members reporting家成员披露 · fiscal year财年
FY2025
member backlog成员订单积压 — 6
members reporting家成员披露 · fiscal year财年
FY2025
5
of 7 axes reading/ 7 项有读数
40score评分
Agriculture & Fertilizer
Fading退潮
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Supply is catching up while estimates stay high — trim / exit clock.供给赶上而预期仍高——减仓/退出倒计时。
supply loosening while estimates still high — exit clock · policy pipeline: comment close in 7d (2026-11-02); 8 proposed rule(s) last 60d; 10 final rule(s) last 60d
⏳ not a thesis stage — no entry
⚖ Exit
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 2
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 7
members reporting家成员披露 · fiscal year财年
FY2025
member backlog成员订单积压 — 3
members reporting家成员披露 · fiscal year财年
FY2025
⚑ score held back评分受限: GLUT-RISK (late) -> capped at 40
before the cap上限前 47.2 · 5
of 7 axes reading/ 7 项有读数
37score评分
GLP-1 / Obesity
Confirming确认中
from filings来自年报Inferred from annual XBRL filing fingerprints — provisional until a live numeric series confirms.由年度 XBRL 备案指纹推断——在实时数值序列确认前为暂定。
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Estimates are starting to catch up — runway confirmed. Don’t chase the spikes.预期开始跟上——跑道确认。勿追高。
fingerprint-only (annual member filings) TIGHT and revisions rising — awaiting real-time physical confirmation · policy pipeline: comment close in 25d (2026-11-20); 1 final rule(s) last 60d
⏳ fingerprint-only thesis — awaiting real-time physical confirmation; no entry until FRED bottleneck leg fires
⚖ Watch
⚕ FDA: mixed — current 9 / discontinued 5 · captured 4 d ago · source generation 2026-10-20FDA:混合——当前9/停产5 · 采集于4天前 · 来源生成日期2026-10-20
no records: tirzepatide无记录:tirzepatide
regulator: current 9, discontinued 5监管状态:当前9条、停产5条
manufacturer: available 6, limited 3, not stated 5厂商供应情况:可供6条、供应受限3条、未说明5条
The capacity thesis is not observed from this source.产能论断未获观察:该来源不发布产能数据。
FDA recordsFDA 记录: Semaglutide Tablet [To Be Discontinued/not stated] · Semaglutide Tablet [To Be Discontinued/not stated] · Semaglutide Tablet [To Be Discontinued/not stated]
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 1
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 5
members reporting家成员披露 · fiscal year财年
FY2025
member backlog成员订单积压 — 1
members reporting家成员披露 · fiscal year财年
FY2022 ·
value withheld — too few members成员过少——数值不予给出
5
of 7 axes reading/ 7 项有读数
37score评分
Robotics & Automation
Watching观察中
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet
⏳ not a thesis stage — no entry
⚖ Watch
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 2
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 7
members reporting家成员披露 · fiscal year财年
FY2025
member backlog成员订单积压 — 5
members reporting家成员披露 · fiscal year财年
FY2025
5
of 7 axes reading/ 7 项有读数
35score评分
Solar
Watching观察中
Supply供给
Demand需求
Guidance指引
Estimates预期
Entry入场
Not enough signal yet — on the watchlist.信号尚不足——列入观察。
supply not tight; nothing actionable yet · policy pipeline: 1 final rule(s) last 60d
⏳ not a thesis stage — no entry
⚖ Watch
Filing depth年报深度
?Members that reported, and the fiscal year of the read. A suppressed leg shows its count, not a number.披露的成员家数与读数所属财年。被舍去的腿只显示家数,不显示数值。 1
filing leg(s) reading条年报腿有读数
member inventory成员库存 — 4
members reporting家成员披露 · fiscal year财年
FY2025
member backlog成员订单积压 — 1
members reporting家成员披露 · fiscal year财年
FY2025 ·
value withheld — too few members成员过少——数值不予给出
5
of 7 axes reading/ 7 项有读数
Pharmaceutical Preparations
▲ +10
17 un-tracked companies flagging scarcity家未跟踪公司报告短缺
APVOAXSMBMRNBNTCCORTHINDHYPDIBIOIMNMINOMBIOMNKD
“longer lead times”“on allocation”“sold out”“supply constrained”“unable to meet demand”
Semiconductors & Related Devices
▲ +5
13 un-tracked companies flagging scarcity家未跟踪公司报告短缺 · 2 already tracked已跟踪
AAOICBRSCRDOCRUSDIODGSITIPGPMCHPMRVLOSISPENGSHLS
“allocate supply”“capacity constrained”“constrained capacity”“double ordering”“expedite fees”“extended lead times”“longer lead times”“on allocation”“record backlog”“supply constrained”“tight supply”
Surgical & Medical Instruments & Apparatus
▲ +3
6 un-tracked companies flagging scarcity家未跟踪公司报告短缺
APYXGCTKGKOSIVFMDAISGP
“capacity constrained”“longer lead times”“on allocation”“supply constrained”“unable to meet demand”
Services-Prepackaged Software
▲ +3
6 un-tracked companies flagging scarcity家未跟踪公司报告短缺 · 1 already tracked已跟踪
BSYCDNSFSLYNABLPCTYRBRK
“extended lead times”“on allocation”“record backlog”“sold out”“unable to meet demand”
Printed Circuit Boards
▲ +5
5 un-tracked companies flagging scarcity家未跟踪公司报告短缺
BHECLSKEPLXSTTMI
“extended lead times”“longer lead times”
Orthopedic, Prosthetic & Surgical Appliances & Supplies
▲ +3
3 un-tracked companies flagging scarcity家未跟踪公司报告短缺
ALGNCDREHSCS
“constrained capacity”“record backlog”“supply constrained”
Electric Services
▲ +3
3 un-tracked companies flagging scarcity家未跟踪公司报告短缺
FRVOHDRNOPTT
“extended lead times”“record backlog”
Wholesale-Electronic Parts & Equipment, NEC
▲ +3
3 un-tracked companies flagging scarcity家未跟踪公司报告短缺
ARWRELLSPRS
“extended lead times”“longer lead times”
Heavy Construction Other Than Bldg Const - Contractors
▲ +2
3 un-tracked companies flagging scarcity家未跟踪公司报告短缺
CDNLJROAD
“record backlog”
Electronic Components, NEC
▲ +2
3 un-tracked companies flagging scarcity家未跟踪公司报告短缺
ESPLGLVICR
“extended lead times”“record backlog”
Crude Petroleum & Natural Gas
▲ +1
3 un-tracked companies flagging scarcity家未跟踪公司报告短缺
AESIEGYRRC
“longer lead times”“on allocation”“sold out”
Miscellaneous Electrical Machinery, Equipment & Supplies
▲ +1
3 un-tracked companies flagging scarcity家未跟踪公司报告短缺
AETNEOSEFLNC
“record backlog”“unable to meet demand”