Goldman Sachs SELL

GS Utilities Daily Spain calls for EU levy on gas & oil profits for climate fund Vestas secures 50 MW orders in Germany

Sep 5, 20268 pages

From the report报告摘录Spain's EU Climate Levy: New EU tax on oil/gas profits (€50bn cost) creates regulatory risk, reshapes energy market dynamics, and alters profit margins for energy firms.

Inside the report报告内文 Verbatim from the original PDF — first pages原版 PDF 开篇原文 · 逐字摘录

Equity Research 4 September 2026 | 8:50AM CEST

GS Utilities Daily: Spain calls for EU levy on gas & oil profits for climate fund // Vestas secures 50 MW orders in Germany

Alberto Gandolfi | Goldman Sachs Bank Europe SE - Milan branch

Ajay Patel | Goldman Sachs International

Mafalda Pombeiro | Goldman Sachs International

Dhwani Khenwar | Goldman Sachs India SPL

Lawrence Lavizani | Goldman Sachs International

Liam Brueckner | Goldman Sachs International

Goldman Sachs does and seeks to do business with companies covered in its research reports. As a result, investors should be aware that the firm may have a conflict of interest that could affect the objectivity of this report. Investors should consider this report as only a single factor in making their investment decision. For Reg AC certification and other important disclosures, see the Disclosure Appendix, or go to Analysts employed by non-US affiliates are not registered/qualified as research analysts with FINRA in the U.S.

Goldman Sachs GS Utilities Daily

Research you can’t miss from past two weeks RWE: Becoming a Vertically Integrated Powerhouse

Drax: Attractive cash generation story with options for upside; up to Buy

German Utilities: Gas draft regulatory paper: Allowed returns proposal a clear setback

RWE: Quantifying growing optionalities. We see much more to come

Siemens Energy: Raising EPS estimates post strong Q3 results

Spain calls for EU levy on gas & oil profits for climate fund

Spain has called on the EU to establish a climate adaptation fund which would be financed through a tax on oil and gas profits to protect member states against increasingly extreme climate events. It is estimated, according to press, that the sustained heat in Europe this summer could cost at least €50 bn. The measure will be discussed at informal meeting later in September. Source: FT

Vestas secures 50 MW orders in Germany

Vestas has secured a 50MW order from European Energy Deutschland for the Wulfshagen repowering project in Germany. The order includes eight V162-6.2 MW turbines along with 20-year service agreements. The delivery is planned to begin in Q1 2027, with commissioning scheduled to begin in Q4 2027. Source: Press Release

Other news US Data Centers: California’s lawmakers passed a package of bills establishing specialized electricity rates for large-scale data centers. Operators will be required to fully fund their own power generation, transmission infrastructure upgrades, and grid maintenance costs, as well as complete environmental impact reports and publicly disclose their water and energy consumption. (DataCenterdynamics)

Danish onshore wind: A group of Danish onshore renewable energy developers has initiated a legal challenge with the European Commission over the design of Denmark’s upcoming offshore wind tenders and Contract for Difference (CfD) support schemes. The timeline for the hearing of the case remains to be determined. (Renews)

The European Union’s gas storage facilities are only 65% full, well below the 80% average for late august over the recent years. (FT)

Germany has said that it will intervene to fill gas storage levels in an emergency situation. (Montel News)

German gas storage association Ines has urged the government to make available incentives to induce injections ahead of winter. (Montel News)

France‘s nuclear power capacity will reportedly face a reduction during the winter season following an extension of the maintenance outage at the Gravelines 5 reactor, which is now scheduled to remain offline until January 25, 2027. (Bloomberg)

Read the full report + PDF阅读全文与 PDF

The full summary (3 key points) and the original Goldman Sachs PDF are for MastermindX Pro members. 完整摘要(3 个要点)与 Goldman Sachs 原始 PDF 为 MastermindX Pro 会员专享。

Read on MastermindX前往 MastermindX 阅读

Related institutional research相关机构研报

Not investment advice. MastermindX hosts third-party institutional research for reference and education; ratings and views are the authors', not ours. Browse the full Research Vault → 非投资建议。MastermindX 仅收录第三方机构研究,供参考与学习;其中评级与观点均属作者本人。浏览完整研报库 →