J.P. Morgan Sell-side卖方

JPM Malaysia Data Centers Déjà vu of potential US chip controls

Nov 15, 202611 pages页

From the report报告摘录Geopolitical Risk Exposure: U.S.

Inside the report报告内文 Verbatim from the original PDF — first pages原版 PDF 开篇原文 · 逐字摘录

J P M O R G A N Asia Pacific Equity Research 13 November 2026

Malaysia Data Centers Déjà vu of potential US chip controls?

Head of Malaysia Research, Healthcare, Construction, Consumer and Conglomerates Yen Voo, CFA, CA AC ( Reports of potential U.S. chip controls to Malaysia and other Southeast Asian hubs JPMorgan Securities (Malaysia) Sdn. Bhd. (18146- (link) could weigh on near-term sentiment and AI/DC-related valuations, although X) the scope and implications of any measures remain uncertain. Our proprietary Samuel Tan AC Malaysia DC tracker identifies ~3.8GW of capacity associated with Chinese DC ( operators, representing ~25% of Malaysia’s pipeline. Actual Chinese end-demand JPMorgan Securities (Malaysia) Sdn. Bhd. (18146- exposure could vary, as our tracker maps operators rather than tenants, and does not X) capture Chinese tenants leasing capacity from non-Chinese colocation providers Nigel Ng (e.g. Yondr, BDC and K2). While contractors serving Western hyperscalers may ( be relatively less exposed to direct restrictions, potential changes in customer investment plans or project timelines could have broader implications. We see JPMorgan Securities (Malaysia) Sdn. Bhd. (18146- X) relatively low direct exposure for GAM/SCGB with their predominantly Westerrn Gokul Hariharan hyperscaler clientele, but would monitor policy developments. YTLP’s integrated ( model offers flexibility in tenant onboarding while Tenaga’s take-or-pay contracts shield the firm from any financial liability, in our view. Meanwhile, Nationgate’s J.P. Morgan Securities (Asia Pacific) Limited/ J.P. Morgan Broking (Hong Kong) Limited (link) AI revenue is now optical driven, not GPU. Karen Li, CFA • Construction: Support from committed investments. While the ( implications of potential US measures remain unclear, we see relatively low J.P. Morgan Securities (Asia Pacific) Limited/ J.P. direct exposure for GAM and SCGB, as most of their DC clients are Western Morgan Broking (Hong Kong) Limited hyperscalers developing capacity primarily for their own use, rather than third- Stephen Tsui, CFA party operators potentially exposed to chip-diversion restrictions. GAM ( appears better positioned with its US MNC hyperscaler client and well- diversified orderbook/earnings (~15% DC-related). SCGB offers greater J.P. Morgan Securities (Asia Pacific) Limited/ J.P. Morgan Broking (Hong Kong) Limited earnings sensitivity to DC contract awards, with every RM1bn change in DC- Alan Hon related wins translating into an estimated 3–4% impact on FY27/28E earnings. ( • Utilities: Tenant flexibility offering some buffer. YTLP’s current 150MW J.P. Morgan Securities (Asia Pacific) Limited/ J.P. tenant mix is split evenly between US and non-US customers. In colocation, Morgan Broking (Hong Kong) Limited GPU procurement sits with tenants, limiting YTLP’s direct exposure. Long- dated contracts with bank-guarantees offer downside protection, while YTLP’s integrated land, power and DC infrastructure lets it target US tenants for future capacity. Further weakness would increasingly discount the ~150MW already live and profitable while ascribing little to expansion. For TNB, five-year take-or-pay DC ESAs protect earnings, and part of our RP5 upside comes from the energy transition, with NETR-linked capex rising from ~RM3bn in RP4 to ~RM9bn of our RM42bn RP5 estimate (link). • Tech: Nationgate’s revenue is now optical driven. Nationgate’s Nvidia GPU assembly lasted about three quarters, and we stripped all GPU revenue from forecasts at end-2025. Any licensing risk sits with exporters, not contract manufacturers, delivering locally. Upside instead comes from optical assembly on China+1.

See page 4 for analyst certification and important disclosures, including non-US analyst disclosures.

Yen Voo, CFA, CA AC Asia Pacific Equity Research ( November 2026 JPMORGAN

Figure 1: Our DC tracker is at ~12.6GW, with ~3.8GW live/under construction, ~3.5GW committed and ~5GW early-stage MW

14,000 5,179 12,695 12,000 3,060 10,000

2,226 1,872 4,000 875 2,000 1,322 1, Capacity Live Under Consutruction Committed Early Stage Latest Capacity

2025 Capacity Est New Capacity Est Source: The Edge, Data Centre…

Read the full report + PDF阅读全文与 PDF

The full summary (4 key points) and the original J.P. Morgan PDF are for MastermindX Pro members. 完整摘要(4 个要点)与 J.P. Morgan 原始 PDF 为 MastermindX Pro 会员专享。

Read on MastermindX前往 MastermindX 阅读

Related institutional research相关机构研报

Not investment advice. MastermindX hosts third-party institutional research for reference and education; ratings and views are the authors', not ours. Browse the full Research Vault → 非投资建议。MastermindX 仅收录第三方机构研究,供参考与学习;其中评级与观点均属作者本人。浏览完整研报库 →